Dynamic Scheduling for Flexible Manufactures - Branch cutting by the “greedy” algorithm Article Index Dynamic Scheduling for Flexible Manufactures introduction The order properties determining the industrial schedule Design of the scheduling solutions tree Branch cutting by the “greedy” algorithm All Pages Page 5 of 5 Branch cutting by the “greedy” algorithm Prev